OK FLAP CLE 10(1), Lake Thunderbird Access
Agency: | TRANSPORTATION, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159797237846256 |
Posted Date: | Feb 22, 2023 |
Due Date: | Mar 8, 2023 |
Solicitation No: | 6982AF23B000010 |
Source: | https://sam.gov/opp/5e877e0dc4... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Presolicitation (Original)
- All Dates/Times are: (UTC-07:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Original Published Date: Feb 21, 2023 04:56 pm MST
- Original Response Date: Mar 08, 2023 02:00 pm MST
- Inactive Policy: 15 days after response date
- Original Inactive Date:
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Norman , OK 73026USA
THIS IS NOT A REQUEST FOR BID
PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
The solicitation will be set aside for Small Business
PROJECT NUMBER: OK FLAP CLE 10(1)
PROJECT NAME: Lake Thunderbird Access
PROJECT DESCRIPTION: The Project is located in Lake Thunderbird State Park, near Norman, Oklahoma. This rehabilitation (3R) project consists full depth reclamation (FDR) and asphalt overlay of 0.91 miles of two road segments and one parking area. The terrain consists of rolling hills varying in elevations from 1086 feet to 1138 feet.
The Project consist of a base bid Schedule (A) and one Option (X):
- Schedule A: Main entrance (0.74 miles) and parking area/boat Ramp
- Option X: Area 2 Road (0.17 miles)
SCOPE OF THE WORK:
The project proposes to utilize FDR with minor widening to achieve a smooth, durable surface to accommodate the large volume of recreational traffic the facility serves. Also included will be repair of failing subgrade through subgrade stabilization at select locations, improving roadside parking and pull-outs, incorporating new signing and striping throughout, and updating facilities to meet American Disabilities Act (ADA) requirements.
All portions of the Project are considered 4(f) resources because they are within Lake Thunderbird State Park. Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work.
PRINCIPAL WORK ITEMS:
Principal work items include:
1,200 linear feet, ditch excavation
260 square feet, reinforced concrete retaining wall
450 tons of roadway aggregate
20,000 square yards of Full Depth Reclamation with Cement, 8-inches deep
4,000 tons of asphalt concrete pavement (PG 70-28 OK)
150 square yards concrete sidewalk
1,600 linear feet of concrete curb
ANTICIPATED SCHEDULE:
The anticipated schedule is:
- Advertisement: March 7, 2023
- Award: May 4, 2023
- Notice to Proceed: May 26, 2023
- Construction: July 5, 2023 through November 30, 2023
To avoid the Park’s busy season, no work will occur from Memorial Day to the end of the Independence Day holiday. Construction duration is estimated to be about two to four months.
ESTIMATED COST RANGE:
The estimated price range is $2 million to $5 million.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Eric Grosskreuz
- CFLConracts@dot.gov
- Kelly Palmer
- CFLConracts@dot.gov
- Feb 21, 2023 04:56 pm MSTPresolicitation (Original)
- Jan 17, 2023 11:45 am MST Sources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.